BLID Update 5.29

Work underway….

 

•  The utility vaults installation along S. 7th to S. 9th on the eastside of Broadway will soon be set and adjusted.

•  Roadway grading from 6th to 9th on Broadway.

•  Sidewalks are being poured along S. 7th and on Broadway from 7th to 9th.

•  Roadway paving on Broadway, from S. 6th to S. 7th and on S. 7th from Broadway to St. Helens is scheduled for mid-June.

•  Large Power Vault being installed on S. 9th near the Pantages.

 